How Much Does a Kitchen Remodel Cost in South Florida in 2026?

kineticconstructio
Aug 18
4 min read

It's the question every homeowner asks first, and the honest answer is: it depends heavily on scope. But "it depends" isn't useful when you're trying to plan a budget. Here's a realistic breakdown of what kitchen remodels actually cost in Miami-Dade and Broward right now, broken down by project tier.



The Three Tiers of Kitchen Remodels

Cosmetic Refresh: $15,000 to $35,000

This tier keeps the existing layout — cabinets stay in place (or get refaced), plumbing and electrical stay where they are. Work typically includes new countertops, a tile backsplash, new appliances, new lighting fixtures, and paint or cabinet refacing. This is the fastest and least disruptive option, with timelines of 2 to 4 weeks.

Mid-Range Remodel: $35,000 to $75,000

This is the most common renovation tier in South Florida. It typically includes new cabinetry (not just refacing), new countertops, new flooring, updated electrical (additional outlets, new lighting circuits), some plumbing relocation (moving a sink or adding a dishwasher line), and possibly removing a non-structural wall to open the space. Timeline: 6 to 10 weeks including permitting.

High-End / Full Gut Remodel: $75,000 to $150,000+

This tier involves a complete teardown to the studs, custom cabinetry, premium countertops (quartz, natural stone), high-end appliances, full electrical and plumbing relocation, potentially structural changes (removing load-bearing walls, requiring engineering), and often extending into adjacent spaces. Timeline: 10 to 16 weeks including permitting and potential structural engineering review.



What Drives Cost Within Each Tier

Cabinetry — This is typically the single largest line item, often 30% to 40% of the total budget. Stock cabinets run $150 to $400 per linear foot installed. Semi-custom runs $400 to $750 per linear foot. Full custom cabinetry can exceed $1,000 per linear foot.

Countertops — Laminate starts around $20 to $50 per square foot installed. Quartz, the most popular choice in South Florida due to its durability and low maintenance, runs $70 to $150 per square foot. Natural stone (granite, marble) ranges widely, $60 to $200+ per square foot depending on the material.

Appliances — A mid-range appliance package (range, refrigerator, dishwasher, microwave) typically runs $5,000 to $12,000. High-end packages with built-in or professional-grade appliances can exceed $25,000.

Layout changes — Moving plumbing fixtures, removing walls, or reconfiguring the kitchen's footprint adds significant cost. Relocating a sink or gas line can add $1,500 to $5,000. Removing a load-bearing wall, including the structural beam and engineering, can add $5,000 to $15,000 or more.

Flooring — Tile, the South Florida standard for kitchens, runs $8 to $20 per square foot installed depending on material quality. Luxury vinyl plank is a popular, more budget-friendly alternative at $5 to $12 per square foot.



South Florida-Specific Cost Factors

Permitting — Any kitchen remodel involving electrical, plumbing, or structural changes requires a permit. Permit fees and the cost of having plans prepared typically add $500 to $2,500 depending on scope and jurisdiction.

Hurricane considerations — If your remodel involves any exterior wall openings (a new window over the sink, a sliding door to a patio), HVHZ-compliant impact products are required, which cost more than standard products elsewhere in the country.

Humidity and moisture management — South Florida's climate makes proper moisture barriers and mold-resistant materials especially important in kitchens, which can add modest costs to materials selection but pays off in long-term durability.

Labor market — Skilled trade labor costs in South Florida have risen significantly in recent years due to high construction demand. Labor typically represents 30% to 50% of total project cost depending on complexity.



What Most Homeowners Underestimate

Lead times on cabinetry and appliances. Custom and semi-custom cabinetry often has 8 to 12 week lead times. High-end appliances can have similar waits. These lead times often determine your project schedule more than the actual construction work.

The cost of "surprises" in older homes. Many South Florida homes were built decades ago. Opening up walls or removing old cabinetry frequently reveals outdated wiring, plumbing that doesn't meet code, or termite damage that must be addressed before the visible remodel can proceed. A contingency budget of 10% to 15% above your contracted price is a smart buffer for any remodel in an older home.

Temporary kitchen costs. During a full gut remodel, you'll likely need a temporary kitchen setup (a folding table, microwave, mini-fridge) or will be eating out more — both real costs that don't show up in the contractor's estimate but affect your household budget.



How to Get an Accurate Number for Your Home

National average calculators are nearly useless for South Florida because they don't account for HVHZ requirements, local labor rates, or permitting costs specific to Miami-Dade and Broward. The only reliable way to get a number you can plan around is an in-home consultation with a licensed local contractor who can evaluate your specific layout, existing systems, and scope.

Kinetic Construction provides detailed, itemized estimates for kitchen remodels throughout Miami-Dade and Broward — no vague ballpark numbers. Call us at (954) 639-2154 or visit kineticconstructionusa.com to schedule a consultation.

 
 
 