How Long Does the Permit Process Take in Broward County?

  • kineticconstructio
  • Jul 25
  • 3 min read

One of the most common frustrations homeowners face when planning a renovation in South Florida is the wait. You've hired your contractor, picked your materials, and you're ready to go — but nothing can happen until the permit is approved. So how long does that actually take in Broward County? Here's a realistic breakdown.



The Honest Answer: It Varies

Permit processing times in Broward County depend on three things: the complexity of your project, the jurisdiction handling your permit, and current application volume at the building department. There's no single universal timeline, but here are the ranges you should plan around.



Simple Projects: 1 to 3 Weeks

For straightforward, lower-complexity permits — a window replacement, an HVAC replacement, a water heater, a roof replacement — many jurisdictions in Broward can turn around an approval in 5 to 15 business days. Some offer over-the-counter approvals for very simple scopes.

Broward County's online permitting portal (for unincorporated Broward) has improved processing times for common residential projects. Contractors who submit complete, accurate applications with all required documentation tend to see the fastest turnaround.



Moderate Projects: 3 to 6 Weeks

Kitchen remodels, bathroom renovations, electrical panel upgrades, and similar mid-complexity projects typically require plan review — a licensed plan reviewer at the building department evaluates your submitted drawings and documentation for code compliance before the permit is issued.

Plan review in Broward's incorporated cities (Fort Lauderdale, Pembroke Pines, Hollywood, Deerfield Beach, Coral Springs, etc.) typically runs 2 to 4 weeks for residential projects. Each city has its own building department with its own staffing levels and review cycles.



Complex Projects: 6 to 12+ Weeks

Room additions, structural changes, ADUs (accessory dwelling units), whole-home renovations, and commercial work require more detailed plan sets and often multiple rounds of review. Expect 6 to 12 weeks or more for plan review and permit issuance on these projects. Large or unusual projects may require peer review by a structural engineer or other specialist, adding additional time.



The City-by-City Factor

This is the most important variable most homeowners don't know about. Broward County has 31 incorporated municipalities — and each one has its own building department, staffing level, and processing culture. Fort Lauderdale and Pembroke Pines have invested heavily in online permitting and tend to move faster. Smaller cities with less staff may have longer backlogs.

An experienced Broward contractor knows which cities move quickly and which require extra lead time — and plans the project schedule accordingly.



What Slows a Permit Down

Even after submission, permits can stall. Common reasons:

  • Incomplete application — Missing drawings, missing contractor license documentation, missing owner authorization, or incomplete scope descriptions trigger a "deficiency notice" requiring the applicant to resubmit corrected materials. Each deficiency cycle can add 1 to 3 weeks.

  • Peer review required — Some structural or engineering elements require independent review beyond the building department's staff.

  • Zoning or HOA issues — Certain project types require zoning approval in addition to a building permit. HOA approval, while not a government function, is often required before a permit is issued for exterior changes.

  • High application volume — Permit volume surges after major storms, during certain times of year, and when construction activity is high. Backlogs can double or triple normal processing times.



How to Keep Your Project on Track

The most effective way to avoid permit delays is to work with a licensed contractor who submits complete, properly documented applications the first time. At Kinetic Construction, we prepare every permit application carefully, track the review status actively, and respond immediately to any deficiency notices. We also sequence the permitting and material ordering phases of your project to run in parallel wherever possible, so you're not losing weeks waiting on a permit after materials have already arrived.